Skip to main content

Confirm Howard Smith Wharves Path is DDA compliant

View on the council website (opens in a new tab)
Status: CLOSED, finished
Signatures: 105
Closed: 23 Nov 2025
Principal petitioner: Donald Campbell
ePetition number: 1494

The petition

Residents draw to the attention of council that the primary path through the Howard Smith Wharves site (a path being a condition of the development approval) may no longer be compliant with the Disability Discrimination Act, in particular the relevant Australian Standard, AS 1428.1 “Design for access and mobility”. When constructed, the Howard Smith Wharves primary path (inclines) complied with the definition of a walkway (no steeper than 1in20) however, this may no longer be the case. Since opening, Howard Smith Wharves has installed speed bumps along the primary path with at least one on an inclined surface. The installation of one (if not more) of these speed bumps may have resulted in a path that is no longer compliant with the Australian Disability Discrimination Act and it’s relevant Australian Standard AS1428.1. As the path is not on natural ground but a constructed landscaped surface, the path must comply with the Act. It should be noted that the Howard Smith Wharves leases the property lot from Brisbane City Council.

Your petitioners therefore request Brisbane City Council conduct independent investigations to ensure that the primary path through Howard Smith Wharves is compliant with the Australian Disability Discrimination Act and it’s relevant Australian Standard AS1428.1 “Design for access and mobility” and act accordingly. Any investigation results must be made public including the land survey data.

Council response

Council acknowledges your concerns with the installation of speed control devices (speed bumps) along the HSW shared path and their potential impact on path gradients and compliance with DDA and Australian Standard AS 1428.1 - Design for access and mobility . Council recognises the importance of ensuring that public access infrastructure provides equitable, safe and dignified access for all users, including people with disabilities.

As part of previous rectification works, Council supported installation of speed control devices along the existing shared path through HSW. The installation of speed platforms (speed tables) were in accordance with Council’s standard drawing BSD-3216 - Local traffic area – speed platform - mid block - general design criteria , with entry and exit ramps not exceeding the maximum grade and achieving DDA compliance.

HSW is well utilised by the community and continues to evolve over time, on 23 September 2024, Council received a development application (DA) (A006618899), which sought approval to modify elements of the precinct including the shared path. On 27 May 2026, after assessment against the requirements of Brisbane City Plan 2014 (City Plan) and in accordance with the provisions of the Planning Act 2016 , the DA received Council approval. Council took all assessment matters into account, including the issues raised by submitters and petitioners, and concluded that the application was in accordance with the requirements of City Plan. The approval includes conditions for the design of the updated shared path, including a requirement to remove all existing speed control devices.

You can access a copy of Councils decision, including conditions and plans, by visiting Council’s DA portal ‘Development.i’ at developmenti.brisbane.qld.gov.au and searching application reference ‘A006618899’.

Council appreciates the community’s role in highlighting accessibility concerns and remains committed to maintaining inclusive public spaces across Brisbane.

Comments · 0

Loading...

Loading comments...