Bike Safety in Yeronga
The petition
Yeronga and Yeerongpilly residents and cyclists draw to Council's attention the lack of safe bike infrastructure on the Cardross St bridge at Fairfield Rd, Yeronga. There are no bike lanes, no bike boxes and a very narrow 1m wide footpath with poorly located green walk buttons that put cyclists at risk from being hit by a car. In addition, BUG South users report the thermal road hotspot at the traffic lights is not triggered by cyclists.
Petitioners request that Council: 1. Install a bike box on Cardross St to provide a safe on-road lane for bikes turning into Fairfield Rd; 2. Relocate the green walk button for crossing across Fairfield Rd to a more suitable location, preferably on the same pole as the Cardross St green walk button; and 3. Widen the footpath to provide additional off-road cycling and pedestrian space.
Council response
Your request for Council to install safe cycling infrastructure on the Cardross Street bridge is noted. Council is not able to install a bicycle head start storage area (bike box) on Cardross Street as there is insufficient room to provide safe entry to the bike box when vehicles are stopped at the traffic lights. Installation of a bike box would put the onus on cyclists to filter safely to the front of the queue before left-turning vehicles get a green light, which poses a safety risk. Council has investigated modifying the line markings to provide additional space for a bike lane and bike box, however, there is insufficient room to accommodate these changes due to the road space needed for buses and trucks to turn into Cardross Street. In addition, in ground vehicle detectors would be required to be moved back, which is not possible due to the bridge structure. In-ground vehicle detectors need to be used at this site as it coordinates with other intersections along Fairfield Road, and the use of thermal detectors solely would not allow for suitable coordination.
There is currently a thermal detector installed to detect bicycles on the Cardross Street approach to Fairfield Road, which triggers the signal phase for cyclists. A review of the detector shows it is currently operating as intended and there have been no recent faults reported to Council. To further reduce the risk of missed bicycle detections, in mid-June, Council install an additional detector unit at the location. Missed detections can be reported to Council’s 24-hour Contact Centre on 3403 8888 for expedited attendance by Council’s traffic signal maintenance technicians.
Council acknowledges active transport connectivity could be improved at the location, however as outlined above, possible improvements are limited by the existing rail bridge infrastructure. Council has a long-term plan to improve the Cardross Street connection over the railway line to Fairfield Road. It should be noted that any road widening project on Cardross Street would require significant modification or replacement of the existing Queensland Rail (QR) bridge structure.
Consultation with QR, as the manager of the rail corridor land, would be required to ensure that any future works are consistent with new standards and/or planned upgrades to the rail corridor. As such, Council has written to QR to advise of your concerns and request information on any future plans to renew or upgrade the bridge, as this will inform Council’s future planning.
The planning, design and construction of large traffic bridges is a very expensive undertaking and, in this case, would require substantial financial support from the Queensland Government. It is noted that if QR requires increased clearances, that this would incur significant financial costs and engineering constraints, as well as potential significant impacts to adjoining properties.
At this time, there is no funding and/or timeframe to widen the Cardross Street bridge for general traffic and/or active travel movements. There is a high demand for road network improvements throughout Brisbane and consideration for funding of specific proposals are subject to an assessment of their priority relative to other similar citywide projects. This ensures that Council’s resources are directed to streets and areas most in need of such traffic management works, including those that offer the greatest benefit in terms of safety and amenity to the wider community.
Thank you for raising this matter.