Remediation of stormwater drainage for properties in Tilleydale Estate and East of Tilleydale Estate to Greencamp Road, Wakerley

View on the council website (opens in a new tab)
Status: CLOSED, finished
Signatures: 38
Closed: 18 Mar 2023
Principal petitioner: Vanessa Tooley
ePetition number: 1210

The petition

Residents draw to the attention of Council the significant overland flow of stormwater occurring in properties situated East of the Tilleydale Estate impacting properties from 150 to 84 Tilley Road, 107 to 95 Red Gum Crescent, and others in Wakerley. The residents of the properties situated at these numbers regularly experience overland flow across their properties from the direction of New Cleveland Road to Green Camp Road and then out to Lota Creek. This water previously flowed through a low flow path which has since been filled over the years as a result of developments (subdivisions) which now results in a large amount of water flowing through these properties. Residents who hail from the addresses above believe that it would be best practice for Council take out a drainage easement on their properties, in order to create an appropriate watercourse to reinstate previous stormwater management through the abovementioned low flow path, and to be able to maintain this watercourse properly and address the overland flow issues in the area as well as address any infrastructure constraints. Residents also draw to the attention of Council the need for more adequate stormwater infrastructure and maintenance of the existing, alongside Tilley Road roadway to manage stormwater effectively to avoid inundation of the properties situated at 150 to 84 Tilley Road as well as over road flooding creating significant pot holes.

Your petitioners therefore request that Brisbane City Council investigate infrastructure constraints in the area and explore the creation of a drainage easement, in the appropriate location, to address issues of overland flow and inundation, across the properties situated from 150 to 84 Tilley Road, 107 to 95 Red Gum Crescent and others East of the Tilleydale Estate in Wakerley. Further, your petitioners request Brisbane City Council investigate infrastructure constraints alongside Tilley Road roadway to manage stormwater effectively to avoid inundation of the properties situated at 150 to 84 Tilley Road, as well as over road flooding creating significant pot holes. Council is requested to maintain, remediate and install appropriate infrastructure to effectively manage stormwater.

Council response

Thank you for your petition requesting Council undertake investigations on infrastructure constraints in the area and alongside Tilley Road, Wakerley, specifically to manage stormwater effectively and explore the creation of a drainage easement, as well as maintain, remediate and install appropriate stormwater infrastructure to address overland flow across properties in the vicinity of Tilley Road and Red Gum Crescent, Wakerley

Council’s Flood Awareness Map indicates that the existing large diameter (1650 mm) stormwater main running along Tilley Road is sufficiently sized to cater for a 10% Annual Exceedance Probability (one-in-10 annual chance) event. This meets Council’s standard for underground drainage infrastructure to achieve a balance between flooding, amenity and economic feasibility. In extreme events that exceed Council’s design criteria, such as the February 2022 flood event, runoff would exceed the capability of the stormwater drainage system on Tilley Road, which may result in flooding.

While there is potentially space available, the drainage conveyance capacity of the proposed easement would be limited to very minor flows due to the flat natural topography. At most, a new drainage path would likely only accommodate minor runoff from regular rain events and provide little benefit to either existing dwellings or to the public more broadly.

Council notes the suggestion for an alternative drainage path utilising Council land and an existing drain on Red Gum Crescent. The drain located on Red Gum Crescent is appropriately 2.5 m wide and receives runoff from adjacent land and roadways. It has limited capacity to receive additional flows from the 250 m to 350 m wide major flow path through the private properties along Tilley Road.

The section of Council-owned land suggested for the drainage alignment contains significant natural vegetation that is mapped for protection under various Queensland Government and Council planning overlays and other mechanisms. Therefore, construction work to establish a new drainage path at this location would be subject to costs and constraints relating to investigations, permits, approvals and offsets. Due to the nature of the land, the size of the upstream catchment and the magnitude of rainfall in extreme events, it is unlikely that any waterway works in the proposed locations could materially lessen the impacts of major floods.

Council’s drainage upgrade program is developed according to citywide priority and budget availability. Due to the limited capacity to reduce flooding of existing residences, high cost and negative impacts to existing natural habitat, the benefit-cost ratio of these works is considered to be relatively low.

Regular maintenance of Council drainage infrastructure is routinely undertaken and Council is committed to continued regular inspections. During inspections and maintenance of roadside drains, minor sediment deposits are at times identified and removed, although such issues are unlikely to have noticeable impacts on flooding and drainage.

If you wish to further pursue the possibility of drainage upgrades through your property, please contact Council’s Planning Information Office on (07) 3403 8888.

Thank you for raising this matter.