Noise from Trucks and Trailer using Tilley Road Wakerley
The petition
Residents draw to the attention of heavy vehicles using Tilley Road (heading towards Green Camp Road). Following damage to Tilley Rd during the February floods and subsequent repair, the road surface is uneven and rough. This road is used by heavy vehicles and tippers and vehicles towing trailers to the Chandler dump. These vehicles hit this uneven section doing a minimum 70 km/h or more... especially when returning from the dump empty, and create a loud noise that echoes through the neighbourhood. Due to the heaviness of the trucks and tippers they are creating the road to become even more uneven. There are homes lining both sides of Tilley Road and this noise is impacting local residents including shift workers, young mums and people working from home.
Your petitioners therefore request that Tilley Road be resurfaced urgently, making the road smoother to obtain less noise from the trucks and trailers.
Council response
Thank you for your petition requesting Council resurface Tilley Road, Wakerley.
Council has completed an onsite investigation and considered your request.
Tilley Road, Wakerley, was inspected on 12 October 2022. The portion of roadway on Tilley Road from Green Camp Road through to London Road has pavement cracking and minor changes in grade which Council acknowledges does increase road noise. While Tilley Road was impacted by the February floods, this did not materially contribute to any deterioration of this road. I can advise that Council has listed a resurfacing project for consideration in a future budget. Each June, all listed projects are prioritised and assessed against the overall needs of the city.
Minor pavement repairs were completed on 9 January 2023 to address the larger displacements in the asphalt roadway. These repairs were limited to 100 square metres.
Comments · 0
Please log in to post a comment.
Loading comments...