Petition to reinstate parking in Elizabeth Street
The petition
Parking has been removed and a bike lane has been installed in Elizabeth Street. This is affecting businesses on Elizabeth Street in a very negative manner (Council businesses included). This is affecting the people who park here for short periods to do quick jobs. There is nowhere to be dropped off. Bikes and Scooters are still using the foot path, not enough people are using the bike lane to justify it. People are falling over the yellow bollards and injuring themselves. There is potential for severe injury or death if someone falls into the path of an oncoming vehicle. The traffic congestion is worsening throughout the city because of the bike lane. Courier drivers are really affected by the changes. Brisbane City is one of the most expensive places for off street parking world wide.
Please reinstate the parking for the public. Find an alternative route for the bike lane or remove it all together.
Council response
Thank you for your petition requesting Council remove or relocate the bike lane and reinstate parking in Elizabeth Street, Brisbane City.
Your request for Council to reinstate parking and loading zones for businesses and customers and remove the Cycleway on Elizabeth Street, is noted. Prior to opening the Cycleway, Council relocated loading zones to the northern side of Elizabeth Street, between Albert Street and Creek Street, and installed new loading zones on Charlotte Street. Six disability parking spaces were also relocated at other locations. Understandably, all general parking spaces were unable to be relocated due to the finite amount of kerbside space with the Brisbane CBD.
As is the case with many CBD’s, there is a limited supply of on-street parking in many inner-city areas to meet the demand of residents, businesses and visitors. While Council works hard to balance the limited on-street parking resources for the many different road users, it is inevitable that the high parking demand generated in the Brisbane CBD outstrips the limited supply of kerbside space.
Council is aware of the challenges for the provision of on-street parking in inner city areas, however, the Brisbane CBD environment poses significant constraints to the availability of on street parking such as clearways, bus zones and other kerbside provisions. As such, it is not feasible for Council to create large quantity of on-street parking. However, Council will continue to monitor the dynamic parking conditions within the Brisbane CBD and make necessary modifications to achieve the most balanced utilisation of the existing on-street parking spaces.
To assist in short-term parking availability, Council introduced 15-minute free parking at parking meters, and discounts at its carparks in King George Square and Wickham Terrace, to assist businesses in the Brisbane CBD. In addition, to help the city move Council operates the free City Loop. This service operates at a high frequency within the Brisbane CBD, Monday to Friday between 7am and 6pm.
Your concerns regarding pedestrian safety due to the raised yellow kerbing that physically separates vehicle and bike movements along the length of the Cycleway, is noted. Council installed footpath stickers and additional raised guideposts along Elizabeth Street in late-May 2021, to assist in increasing awareness of the Cycleway before pedestrians begin to cross the road. The raised yellow kerbing is installed as per the project design, which has been certified by a Registered Professional Engineer of Queensland and is considered safe for use.
Council acknowledges the growth in alternative modes of transport that are emerging such as e-mobility and has addressed this in the Transport Plan for Brisbane – Strategic Directions . Due to the increasing popularity of these new modes of transport, and the demand for improved cycling access into the CBD, Council proposed the cycleway trial.
The Cycleway on Elizabeth Street connects to existing and future bikeways and active transport bridges, improving accessibility to activity sites within the city and directness of travel within the network. The alignment helps to meet the overall long-term city centre network requirements to reduce the volume of vehicle movements within the city and improve safety for all road users, by delivering connected and accessible active transport options.
Council recently completed the CityLink Cycleway trial evaluation, commissioning external organisations to complete independent evaluations of the trial. The evaluations used a range of data and community surveys to examine community perception and support of the Cycleway and its improvements to safety, economic benefits of active travel and road network context.
All feedback received during the trial period was considered as part of the overall evaluation. Based on this evaluation, Council has determined the trial to be successful. Council is currently assessing options to make CityLink Cycleway permanent. Accordingly, Council has no plans to remove the Cycleway and reinstate parking along Elizabeth Street.
Thank you for raising this matter.
Comments · 0
Please log in to post a comment.
Loading comments...