The petition

Residents draw to the attention of Council the need to increase funding for suburban drainage works. Last year, the Lord Mayor cut drainage funding by $1.3 million and complaints increased by 62% as a result. Residents are paying more in their rates every year, but they are getting fewer services in the suburbs. Brisbane is prone to flooding. 40% of our city is built on a floodplain and with the effects of climate change being felt already, we need to see a significant increase in spending on basic drainage to ensure people don't experience flooding on a regular basis. Hundreds of basic drainage works are awaiting funding in the Lord Mayor's budget that cannot be completed until more funding is allocated. Some of these works are to fix broken and damaged drainage assets, some are for upgrades. Council's budget is $3.6 billion. Currently only $32 million is allocated for the design and construction of drainage and stormwater infrastructure. This funding is spread across 190 suburbs.

Your petitioners therefore request funding to be increased and fast tracked to audit Brisbane's drainage infrastructure and complete all new and outstanding stormwater and drainage maintenance jobs and upgrades in Brisbane's suburbs.

Council response

Thank you for your petition requesting that Council increase funding for completion of all new and outstanding stormwater drainage maintenance jobs and upgrades.

Council has allocated $32 million for the design and construction of stormwater drainage infrastructure in the 2022-23 budget. This funding is shared across 190 suburbs.

Council’s stormwater works program aims to deliver infrastructure to minimise flooding impacts on residential properties. In developed areas, Council seeks to provide a 1 in 10-year immunity from overland flow flood inundation to living and utility areas of residential properties. The stormwater works are identified from planning studies and stormwater drainage investigations arising from flooding complaints.

The list of proposed works is reviewed and prioritised as part of the annual budget development process. The capital works program is prioritised on a citywide basis having regard to cost‑effectiveness, frequency and severity of flooding, and the number of affected residential properties.

Council regularly inspects and maintains its stormwater drainage system to ensure it is clear and functioning as expected. Approximately 100 kilometres of the enclosed drainage network is inspected annually. While gully traps, which are prone to blockage, are proactively inspected and cleaned up to 12 times per year.

In addition, since the February 2022 flood event, Council inspected approximately 8,078 gully traps, and cleaned them as needed. Inspection of the entirety of the 367 kilometres enclosed drainage network, which was inundated during the February 2022 flood event, was completed at the end of November 2022. With remaining maintenance works anticipated to be completed by the end of February 2023, weather permitting.

Thank you for raising this matter.