The petition

Residents draw to the attention of the Lord Mayor and Council that during the 2011 and 2022 floods parts of the Morningside Ward were affected by water which came up from the river through the drainage networks and into streets, commonly referred to as backflow flooding. Residents understand that the installation of backflow valves will not prevent flooding but would help lessen its impact during flood events.

Your petitioners therefore request that:-

1) An urgent report be prepared to investigate the impact of backflow valves in the Morningside Ward to identify possible locations for the installation of future backflow devices;

2) That the locations identified in 2011 as feasible for backflow devices in the Morningside Ward be urgently installed including (but not limited to):-

- Apollo Rd and Carbeen, Coutts, Kenbury and Bulimba Streets, Bulimba;

- Stage 2 Jamieson and Stuart Street, Bulimba;

- Lindsay Street, Hawthorne;

- Adina and Frank Streets, Norman Park;

- Brentnall Street, Norman Park;

- Waite Street, Norman Park; and

- Wendell Street, Norman Park.

Council response

Thank you for your petitions requesting that Council urgently install backflow devices in the Morningside Ward.

An independent review has been undertaken with respect to the 2022 Brisbane flood event. The Brisbane City Council 2022 Flood Review (the Review) made 37 recommendations, all of which have been adopted. Recommendation 3.1 of the Review recommends that Council continue to assess and prioritise the installation of backflow devices as part of its flood mitigation strategy. The Review can be found at www.brisbane.qld.gov.au on the ‘2022 severe weather event recovery’ webpage.

Following the Review’s recommendations, Council is reviewing the feasibility of the backflow devices sites identified in the 2012 report against the latest Economic Assessment Framework provided by the Queensland Government. The investigation is in progress and any future works identified, as a result of the investigation, will be considered along with other potential projects across the city according to citywide priority and budget availability as determined through Council’s annual budget process.

It should be noted that Stage 2 backflow device construction works at Jamieson and Stuart Streets, Bulimba, were completed in 2017-18.

Thank you for raising this matter.