Skip to main content

Nowruz Bridge for Toowong-West End Green Bridge

View on the council website (opens in a new tab)
Status: CLOSED, finished
Signatures: 345
Closed: 25 Sept 2021
Principal petitioner: Iman Falah
ePetition number: 1038

The petition

Residents draw to the attention of 5 Green Bridges Team.

Before I jump into my ideas I would like to introduce myself a little bit: my name is "Iman Falah", Project Planner and Scheduler with construction family background from Iran. I moved to Australia in 2009 and on the other hand I love culture and history of humanity. As an Iranian immigrate I always tried to share and work through community to maintain music, history and culture in Brisbane. I managed to run 4 Nowruz Festivals (2011-2012-2013-2014) in Brisbane with support of BEMAC (Brisbane Multicultural Centre), and published a magazine and also managed and set up Farsi School Brisbane. I also played music with Delkash band in Multicultural festivals in Roma Parkland and Brisbane City Festivals between 2010-16. And nowadays my partner and I are running the only Persian Bookshop in Australia in New Farm.

Why "Nowruz Bridge" for Brisbane? If we go through the Name of Nowruz and concept of this significant Natural event which is 21st March and Harmony Day which has been celebrated in many countries and cultures. Nowruz is a celebration of humanity, integrity and dignity of human beings. For Brisbane which is a multicultural city it will be an amazing Symbol of appreciating Righmand human beings .

Why "Toowong-West End"? I love and live in Toowong since I got to Australia and since its close to University of Queensland it will be many students around and also West End is a Symbol of multicultural suburbs in Brisbane.

Why "Persian Style Bridge"? Persian engineering is a human heritage and during last 25 centuries of engineering, Persian/Iranian were a symbol of friendship with water and soil and wind. If we look at Yazd (The UNESCO Heritage City) we can see how green is this city has been built by it soil and water in the middle of desert. Isfahan and its Bridges (Si-o-Se Pol and Khaju Bridge) as symbol of Nature Friendly engineering. Just few years ago Nature Bridge in Tehran had been designed and constructed based on Khajoo Bridge in Isfahan-Iran and awarded worlds best design. So this is the Idea for future generations which we can develop and offer to Better Brisbane.

Council response

Thank you for your petition requesting Council name the Toowong to West End Green Bridge ‘Nowruz Bridge’ and consider using Persian engineering and design methods when constructing the bridge.

Council is building new green bridges across Brisbane to make it even easier to get around our city on foot, by bike or scooter, or by connecting with public transport. The Green Bridges Program will deliver a new connection between Kangaroo Point and the Brisbane Central Business District (CBD), a new crossing at Breakfast Creek, and new links from Toowong to West End and St Lucia to West End.

In June 2022, Infrastructure Australia identified the green bridges as nationally significant infrastructure, recognising the critical role the city-shaping program will play in shaping our city’s future.

Council recognises the positive level of support for the Toowong to West End Green Bridge as a vital cross-river link that will make it easier for residents and visitors to travel around our city into the future.

While planning for the Toowong to West End was paused in 2022 to prioritise flood recovery activities acrossBrisbane, Council will seek additional contributions from the Queensland and Australian Governments to help Council deliver this critical project.If funding is secured during the flood recovery effort, Council will consider progressing the bridge sooner than anticipated.

Your suggestion for the Toowong to West End Green Bridge to be named in honour of the Persian New Year is appreciated, however given planning for the project has been paused, Council is not looking to name the bridge at the present time. Please be assured your suggestion has been recorded and will be considered as part of future project planning.

In preparing the concept design and preliminary business case for this project, Council investigated the benefits, impacts and cost of the green bridge, and considered the potential bridge form and structure, transport and economic benefits, property impacts, constructability, and how the bridge will integrate with the surroundingenvironment.

While your suggestion to consider Persian engineering and design methods when constructing the Toowong to West End Green Bridge is also appreciated, stone arch bridges like the Si‑o‑se‑pol and Khaju bridgesare not considered a suitable bridge form for active transport bridges across the Brisbane River. The Brisbane River is a fast-flowing river in major events and to ensure that bridge foundations are resilient to major floods, typically the number of piers in the river are kept to a minimum.

The limited number of piers in the river also reduces flooding impacts to properties upstream of the bridge and minimises impacts to river users that frequently pass through the Toowong Reach of the Brisbane River. The Regional Harbourmaster also requires a 70-metre-wide navigation channel in the middle of the river at the Toowong Reach which is difficult to achieve using a multi-arch bridge design similar to Persian-style bridges.

Council undertook community consultation on the concept design for the Toowong to West End Green Bridge from 15 November 2021 to 28 February 2022. At this time, Council also released the key findings of the preliminary business case for this project. The consultation period followed an initial consultation phase in late 2019, and further consultation on bridge alignment options in late 2020 and early 2021. The consultation outcomes for the concept design were released in September 2022 and are available on Council’s website.

Feedback on the concept design will play a critical role in future stages of planning, including the final bridgedesign, ongoing connections to the citywide walking and riding network, and management of impacts during construction, once funding for the project is secured.

Council will continue to keep the community informed and will provide further opportunity for feedbackon the Toowong to West End Green Bridge during future project planning.

Comments · 0

Loading...

Loading comments...