Petition to Save Tugulawa Park
The petition
Tugulawa Park is widely used by the local community for ball sports, picnics, walking dogs and community meetings. It is to be destroyed by a development in the Bulimba area, which will put a four lane road through the middle of the park. Losing the park to a 4 lane road would be devastating for the local community. The proposal to replace Tugulawa Park with a thin strip of almost unusable green space is completely inadequate and misses the point. The massive increase in population on the Bulimba peninsula will require an increase in parkland, along with better traffic management and public transport. Allowing a developer to effectively privatise and destroy a public park sets a dangerous precedent for future developments across the city. The simplest solution is to use the existing access road to the west of the park, while retaining the new parkland to the north east of the park. This ensures that there is a net increase in public parkland to accommodate the increase in population. The community was assured in 2015 that the park would be protected and after a deeply misleading master planning process, the proposed access road was shifted over the park without any consultation.
We, the citizens of Brisbane, petition the Brisbane City Council to save Tugulawa Park by stopping the construction of a 22-metre access road to a proposed private development that would destroy and privatise the park.
We call on the Brisbane City Council to intervene to save the park, by using the existing access road.
Council response
Thank you for your petition requesting Council stop construction of an access road through Tugulawa Park, located at 25 Apollo Road, Bulimba, to the proposed Bulimba Barracks redevelopment at 167 Apollo Road, Bulimba (application reference A005661878).
Council notes the concerns raised in your petition include the following.
It is noted that your preference is to reuse the existing access road to the west of Tugulawa Park and retain parkland for the use of the local community.
Disposal of Commonwealth land(Bulimba Barracks) commenced after the Department of Defence identified in early 2015 that 20.73 hectares of the Bulimba Barracks was surplus to its requirements with the exception of 2.37 hectares which was retained by the Royal Australian Navy (HMAS Moreton).
The Bulimba District neighbourhood plan (BDNP) was adopted by Council on 25 June 2015 and amended on 18 May 2017 to include a more detailed master precinct plan for the Bulimba Barracks. The Bulimba Barracks Master Plan (Master Plan) was developed through extensive stakeholder and community consultation and provides a guide for development outcomes in terms of land uses, building heights, parkland and potential development areas.
The Master Plan and amendment process was a joint activity between Brisbane City Council and the Queensland Government to address the then pressing issue in 2015-16 that the Bulimba Barracks was being prepared for disposal by the Department of Defence.
Road access from the barracks site to Apollo Road via Tugulawa Park has been in existence for a number of decades. Tugulawa Park is a casual recreation space bisected by high-voltage power lines and the continuation of road access, via a different alignment, was considered in the Master Plan as well as the neighbourhood plan amendment process with opportunity for comment and submissions from the public.
Council consulted on the draft Master Plan from 19 October to 1 November 2015. The draft Master Plan showed proposed access to Apollo Road near the western boundary of Tugulawa Park. Following further analysis by Council’s traffic engineers, the location of the access point was moved eastwards, and the alignment of the road modified so that it traverses Tugulawa Park on a more eastern alignment. The proposed road connection seeks to achieve safety, traffic flow and separation from the high-voltage electricity pylon. The Master Plan process also identified park requirements to service the existing and future residential population that focus on a Brisbane River foreshore park and future sports ground.
The proposed change to the alignment was included in the Master Plan Planning Scheme Amendments, released for public consultation between 28 October and 9 December 2016. The alignment, shown in the publicly consulted version from 2016, was adopted by Council and became effective in Brisbane City Plan 2014 (City Plan) on 19 May 2017.
On 12 February 2021, Council received a development application for the redevelopment of the former Bulimba Barracks, including an access road through part of Tugulawa Park.The developmentapplication was properly made on 26 March 2021.
The development application currently under assessment includes the following aspects of assessable development.
The development application has been referred to the Queensland Government’s Department of State Development, Infrastructure, Local Government and Planning (State Assessment and Referral Agency) and Energex (electricity infrastructure).
The development application is impact assessable and is still under review by Council’s Development Services assessment team against the requirements of the City Plan in accordance with Planning Act 2016 (the Act). The developmentapplication requires a 30-business day formal public notification period in accordance with the requirements of the Act. The Act requires certain obligations be carried out which includes placing a notice in a newspaper, erecting signs along the road frontage of the site and advising adjoining landowners of the development.
Before public notification can occur, the assessment team has sought further clarification about aspects of the proposal and has sent an Information Request to the applicant, dated 4 June 2021.
The Master Plan in the BDNP requires any future development on the Bulimba Barracks include three greenspace areas identified as ‘Riverfront’, ‘Sport and Recreation’ and ‘Tugulawa’. The combined area of these three greenspaces is approximately 54,212 square metres or 25% of the Bulimba Barracks and will ensure accessibility and diversity within our park network. Importantly, Tugulawa Park is required tomaintain a minimum area of 3,000 square metres unconstrained by easement.
The ultimate location of the proposed public access road needs to achieve safe sight distances for vehicles entering and exiting Apollo Road. The existing access from Apollo Road does not achieve safe sight distances. To this extent, item two in the Information Request seeks additional information needed to complete the assessment of the public road location.
The design of the access road incorporates two vehicle lanes, prioritised pedestrian and cyclist pathways, pedestrian footpaths and on-street parking either side, generous street tree planting and stormwater treatment.
Item seven of the Information Request requires an amended plan showing Tugulawa Park having a minimum area of 3,000 square metres unencumbered by the major electricity infrastructure high‑voltage power line easement, a minimum 50% frontage to a dedicated road to maximise casual surveillance, and access from Hood Street and Baldwin Street, Bulimba.
Details of the proposed development, including all documents relating to the application can be accessed on Council’s Development.i website at https//developmenti.brisbane.qld.gov.au by searching application reference number ‘A005661878’.