Safer Bike Passage through the Inner North West
The petition
Currently for riders who live in Paddington, Red Hill, Bardon & Milton, they must travel through the dangerous corridors of Railway Tce, Park Rd, & Baroona St. There are no dedicated bike lanes, with drivers being frustrated that riders have to take to the ride, and many are either unaware or intentionally put riders in dangerous situations. The roads are also worn, and some poorly laid. The use of riding for local transport is essential if we are to reduce our carbon footprint as a city. Everyone should have the option to ride a bike or scooter locally, and reduce car use.
I would like a greater priority put on connecting Brisbane for active travel, with dedicated bike lanes installed to service the inner North West of Brisbane.
Council response
Thank you for your petition requesting Council construct dedicated bike lanes to service the inner north-west Brisbane.
Your concerns with cyclists who live in the suburbs of Paddington, Red Hill, Bardon and Milton, who need to travel along Railway Terrace, Park Road and Baroona Road are noted. In Council’s Brisbane City Plan 2014 (City Plan) road hierarchy, Railway Terrace is classified as a neighbourhood road, Park Road is classified as a district road and Baroona Road is classified as a neighbourhood road until Nash Street and is classified as a district road between Nash Street and Milton Road. Neighbourhood roads provide access to local residential properties and district roads facilitate the movement of people and goods to and through suburbs, including buses and heavy vehicles. Attachment B shows a locality map.
In the City Plan Bicycle network overlay, Railway Terrace, Park Road and Baroona Road are identified as secondary bicycle routes. Park Road and Baroona Road are also recognised as Principal Cycle Routes on the Queensland Government Department of Transport and Main Roads Principal Cycle Network plan, recognising the desire for cycling infrastructure along this route. Attachment C shows the Bicycle network overlay.
Current available bicycle count data for Baroona Road from 2017 shows approximately 379 bicycle movements per day (BMPD) at the intersection with Heussler Terrace, and approximately 304 BMPD at the intersection with Park Road and Milton Road. The majority of bicycle movements were on-road and travelling along the corridor. It is therefore estimated that the BMPD at Railway Terrace is greater than 300 BMPD. A review of the same bicycle count data shows that the inbound bicycle movements are highest during the AM peak, also when inbound traffic volumes are at their highest. This demonstrates the route’s likely use by commuters cycling to work.
A review of the latest available data from the Queensland Government’s crash database identified two recorded crashes involving cyclists on Baroona Road, and two recorded crashes involving cyclists on Railway Terrace in the corridor, between 30 June 2011 and 30 June 2021.
On-street parking is a valuable community commodity, and many residents and businesses rely on on-street parking in close proximity to their homes and businesses, for visitors and services. Therefore, changing or removing on-street parking restrictions requires careful consideration, to balance the needs of all users.
Your request for Council to construct dedicated bike lanes to service the inner north-west of Brisbane has been noted. Council is considering cycling infrastructure improvements for the corridor given it is a commuter route and its connection to the Bicentennial Bikeway. Any future planning and construction of bicycle infrastructure along the corridor will be prioritised against projects across the city subject to funding. Bicycle infrastructure will also be considered as part of road upgrades along the corridor.
Your comments about the road condition have also been noted. Council Officers investigated and found Park Road and Railway Terrace did not meet intervention standards for full replacement. It was noted that maintenance works at the intersection of Coronation Drive were required and these will be completed by the end of June 2022 and potholes at the front of 13 Railway Terrace will be repaired.
Baroona Road did not meet intervention standards for full replacement, and it was noted the surface is performing well for its age. There are large transverse cracks outside Milton State School which were of concern to the head petitioner, however they are not considered a road failure and do not require maintenance at this time. Potholes were observed at 119 and 135 Baroona Road and will be repaired.
Thank you for raising this matter.
Comments · 0
Please log in to post a comment.
Loading comments...