Stop Road Works Within Residential at Night
The petition
Night Road Works
STOP Night Road works being done from 8pm. The use of concrete cutting machines and drills that vibrate through at least a block of housing in all four directions is unacceptable.
The noise is loud. This type of work needs to be done during the day when 99% of people are at work, not when 99% of people are trying to sleep.
Council response
Your request for Council to prevent night roadworks within residential areas after 8pm, has been considered. In most situations, works on Council managed roads take place under a temporary road closure certificate issued by Council. The exception to this is when works are required with minimal notice, such as emergency works, that are required to be undertaken as soon as possible by an external authority or contractor. Some examples of emergency works include burst water mains, gas leaks, and telecommunication or electrical faults.
In assessing temporary road closure applications, Council takes into consideration the needs of all users on the road network. All applications are reviewed against the requirements of the Queensland Government’s Manual of Uniform Traffic Control Devices , Part 3, Works on Road, and Australian Standard AS1742.3. Assessors follow a set of guidelines in respect to road hierarchy, traffic volumes, and potential increase to traffic congestion on the wider road network.
It should be noted that the Queensland Government’s Environmental Protection Act 1994 provides an exemption for noise created from road maintenance, road noise, traffic signals, railway or railway signals, public transport infrastructure, maintaining public infrastructure including water and sewage services, telecommunications and electricity, and preventing or removing public health risks.
To ensure services can operate adequately for Brisbane residents without affecting traffic flow, and keep people moving, works are often undertaken outside of hours. Works that are part of a project or work that is being completed over an extended period of time includes community consultation and feedback, however, all other maintenance is permitted without resident engagement.
It is acknowledged that noise from night road works may be an inconvenience to residents who live in the vicinity of where works are occurring. Council will continue to schedule road works in daytime hours, where possible, taking into consideration impacts to the road network.
Thank you for raising this matter.