Residents draw to the attention of the Lord Mayor that ducks, ducklings and other wildlife are being trapped in the weir section of the water harvesting device in Vectis Street Park, Norman Park. Residents have rescued ducks specifically on multiple occasions and the device is a risk to local wildlife who can become trapped.

Your petitioners request urgent funding for and the installation of a duck ramp at this location to provide an exit point for the ducks to walk up and out of the weir section of the water harvesting device. The water harvesting at this location has not been operational for a number of years despite significant financial investment by Council and residents request that the device also be urgently repaired and utilised to the benefit of local sporting clubs.

Council response

Thank you for your petitions requesting Council urgently install a duck ramp at Vectis Street Park, Norman Park, and urgently repair the stormwater harvesting device to be used by local sporting clubs.

The Vectis Street Park stormwater harvesting device previously included a duck ramp, but it became displaced during storm events in the catchment. A new duck ramp was installed on 13 November 2020.

The stormwater harvesting device has remained out of use while water quality issues are resolved. The tide barrier gate was re-engineered and refitted in September 2020, as part of restoring the functionality of the device. In addition, to help improve the quality of the stormwater, Council has also undertaken desilting of upstream drainage infrastructure, re-lined the stormwater pipe under C.P. Bottomley Park, Norman Park, and inspected and repaired the pumps and water tanks.

Further works are still required by Council and Urban Utilities before the stormwater harvesting device will be recommissioned. It is anticipated that it will take a further 12 months until the works are completed at which time the sporting clubs will be able to use the captured stormwater.

Thank you for raising this matter.