Better service on the 100 bus line
The petition
Residents draw to the attention of the poor service during peak times on the 100 bus route to and from Forest Lake via Inala. Frequently delayed, buses full and drivers under pressure. More buses are required, or new routes with better connections to trains - Darra / Oxley
Council needs to do a thorough consultation of this route and the number if people struggling to take connections to the CBD.
Council response
Council operates its bus services under a contract with TransLink, a division of the Queensland Government’s Department of Transport and Main Roads. Council works in conjunction with TransLink to ensure residents and visitors of Brisbane have access to a reliable and accessible public transport network, with TransLink having the overall responsibility for approval and funding of new services or enhancements to the public transport network.
Council’s Network Planners develop public transport proposals in accordance with land use developments and patronage. Council also works in conjunction with TransLink to determine the viability of any new service request. As part of that planning, development applications and Census data is used to predict the population and subsequent growth. This ensures that bus services are well patronised and represent value for money.
The route 100 service operates seven days a week, between 6am and 11pm. The route provides a high frequency service for Forest Lake, Inala and suburbs in proximity of the Ipswich Road corridor via the South East Busway, operating at frequencies of five to 10 minutes during peak times, and at 15 minute intervals at all other times. This means passengers of the route 100 service receive a very high level of service in the context of the Brisbane public transport network.
However, the route 100 service operates on a highly congested corridor, which can result in variable running times that can cause bus bunching, where there may be greater than timetabled gaps between bus arrivals followed by buses in quick succession. Under existing contractual arrangements with TransLink, Council operates a consistent timetable across all times of the year.
Therefore, services will always be subject to significant variations in traffic congestion, road conditions and patronage demand, especially between full network operation and school and university holidays. This has been exacerbated by the COVID-19 pandemic where there have been significant fluctuations in patronage and traffic conditions. General traffic conditions are outside of Council’s control.
The Network Planners have investigated the patronage data and confirmed that the inbound services between 7.05am to 7.35am, and the outbound services between 3.15pm to 5.35pm, are well patronised. However, the data shows that while these buses carry standing passengers for a part of the route between Blunder Road, Oxley, and Woolloongabba busway station, these services are not consistently travelling at full capacity.
There are infrastructure constraints at Queen Street Bus Station (QSBS) where the route 100 service terminates, which means that while select inbound trips can use high-capacity vehicles, they cannot be deployed in the outbound direction.
Council acknowledges additional rail feeder services to Darra and Oxley railway stations would benefit the local community, however any additional services or changes to existing services require approval and funding from TransLink.
While Council has no plans to increase service frequencies at this time, given the exceptionally high frequency of the route 100 service, the Council Network Planners have conducted preliminary investigations into possible alternative solutions for residents of Moorooka utilising the route 100 service and the route 110 and 115 services.
Alternative solutions include modifying routes to include bus stops in the stopping patterns of the following respective routes:
This would provide a greater range of service options for passengers travelling from Moorooka, observing the route 100 service stopping pattern along Ipswich Road and South East Busway, to and from the CBD.
The Ipswich Road corridor is currently subject to a thorough review to support the introduction of the Brisbane Metro and Cross River Rail projects. As part of this, Council will be considering opportunities across the network to improve services for the suburbs and provide connections to the turn-up-and-go Brisbane Metro services. This is taking into consideration the potential growth on the wider transport network to improve bus-rail connections at southside railway stations. Other considerations include opportunities to redistribute high capacity vehicles to more services including the route 100 service, subject to the review of bus stop capacities in the QSBS and bus stops along the Ipswich Road corridor.
While Council continues to have a major role in operating bus services in Brisbane, TransLink has the overall responsibility for public transport services in South East Queensland. Therefore, Council will write to TransLink asking that they consider the petitioners’ request for service improvements to the route 100 service and alternative solutions as identified by Council.
Thank you for raising this matter.
Comments · 0
Please log in to post a comment.
Loading comments...