Extend the New Farm Riverwalk past Howard Smith Wharves
The petition
Residents draw to the attention of Council the need for the New Farm Riverwalk to be extended from its current landing point at southern end of Howard Smith Wharves, past the development and link directly to the City Reach Boardwalk. Since the opening of the Howard Smith Wharves the function of the $100 million New Farm Riverwalk has been undermined. The current active transport corridor that travels through the development does not meet Department of Transport and Main Roads nor Austroads Guidelines. This is due to the path having unnecessary curvature and the lack of segregation of path user groups. Compounding this, the developer has constructed structures immediately adjacent to the active transport corridor where patrons walk out or linger on the corridor blocking its function for transport movement. It is unknown if these structures were given development approval by BCC but media outlets have reported the developer has constructed some structures without BCC development approval. Further to this, the “Shared Zone” in front of the hotel is a danger to everyone. No one whether they are on foot, two wheels or in a motor vehicle feels safe or comfortable. Overall the development is discouraging the through movement of people on foot or two wheels. This is recorded in BCC application documents (A004897686) "Howard Smith Wharves Nominees’ consistent desire for the shared pathway not to have an overt though movement function is acknowledged”.
Your petitioners therefore request that Brisbane City Council extend the New Farm Riverwalk from its current landing point at southern end of Howard Smith Wharves, past the development and link directly to the City Reach Boardwalk. The extension must match the quality of the New Farm Riverwalk in alignment, width and segregation. To minimise the cost to rate payers, the petitioners request that Brisbane City Council seek to recover a significant proportion if not the entire construction cost from Howard Smith Wharves themselves. NB. this petition will be null and void if the existing path through Howard Smith Wharves is corrected as outlined in a previous petition titled “Make Howard Smith Wharves path Safe”.
Council response
After a competitive tender process which commenced in 2013, a 99-year lease tenure was awarded to the current operators of the site for the HSW redevelopment. The leased areas extend from within the perimeter fences atop the adjacent cliffs to the Brisbane River, and from the entrance at Boundary Street to the New Farm Riverwalk. An easement extends through the site which provides a pedestrian and bicycle connection that runs for the length of the site connecting the existing New Farm Riverwalk to the City Reach Boardwalk.
At the western end of the site, this pathway is separated from the main basement car park entry point to allow for the dominant vehicular movements into and out of the site to be separated from pedestrian movements. At this western entry point, the pathway enters a low speed ‘shared zone’ between Buildings 1 (Fantauzzo Hotel), A, B and C (Felons Brewing), allowing for secondary vehicle access to the internal porte-cochere. To the east of Building C, the pathway becomes exclusive use for pedestrians and cyclists, however it is also used by service vehicles performing deliveries, parkland maintenance/refuse collection vehicles and emergency vehicle access.
While it is desirable to separate people walking, vehicles and people riding bicycles where possible, this is always dependent on the uses and environment surrounding the pathway. Council’s underlying requirement for the design of the low speed ‘shared zone’ was to create a slow zone where all users showed the appropriate duty of care by being aware of their surroundings and the different modes using the space. This zone has been clearly identified as a slow speed environment, with curves, pavement treatments and signs used throughout the precinct to alert all users. In addition, to reduce the speed of vehicles, speed reduction devices have been installed in regular intervals along the area. Further to these safety measures, pavement delineation has been painted along the zone to alert pedestrians and cyclists of potential conflict areas where regular crossing occurs.
In relation to the curvature of the path, it is standard engineering practice to introduce bends to slow the speed of the users. The design and construction of the shared low speed environment was certified by a Registered Professional Engineer of Queensland (RPEQ) as a performance outcome to address the Traffic Access Parking and Services Code of the Brisbane City Plan 2014 .
With regard to the primary pedestrian and cycle path, Council imposed on the original approval Condition 70a which required the subsequent submission of functional layout drawings for all internal roadworks, including the pedestrian pathway for approval by Council. These drawings were to be prepared and certified by a Registered Professional Engineer of Queensland (RPEQ). Condition 64 of the approval also required the internal paved areas, including shared pathways, turnaround hardstand areas, thresholds and ramps to be signed and delineated in accordance with the approved drawings and the Queensland Government’s Department of Transport and Main Roads Manual of Uniform Traffic Control Devices and the Transport Operations (Road Use Management) Act 1995 .
On 9 April 2018, functional layout drawings were submitted to Council for assessment. After an assessment was undertaken by Council engineers, the functional layout drawings were approved on 27 August 2018, fulfilling condition 53a (formerly Condition 70a). In certifying the functional layout drawings, the RPEQ assumed the responsibility that the design was in accordance with the required design standards and was fit for purpose.
A copy of the development application and most recent change application, including all documents relating to the application, can be accessed by visiting Council’s website at www.brisbane.qld.gov.au/pdonline and entering application reference numbers A004162925 and A005092838.
With regard to your request for a new riverwalk structure to bypass the HSW site, Council has no current plans to construct a new riverwalk section joining the New Farm Riverwalk and the City Reach Boardwalk. The existing route through HSW is listed as a primary bicycle route on Council's Bicycle network overlay and performs the function of this route, with a shared pedestrian and bicycle pathway provided through the site. If a future Riverwalk structure was investigated, it would need to take into account the proposed CityCat terminal, other mooring points along HSW and any impacts to the rights granted to the lessees under the leases over the HSW site.
Council is currently completing a review of the active transport network plan which will assess key bicycle corridors to identify opportunities for improving network connectivity and safety. Your comments have been noted and these will be considered as part of this review, which will look at options for cycling infrastructure along this route or whether there is an opportunity to improve connections to key destinations such as New Farm and Hamilton by following an alternative alignment. Furthermore, as the site is within the HSW lease area, any proposed improvements would require consent from the lessees and possibly compensation.
Comments · 0
Please log in to post a comment.
Loading comments...