Sherwood/Oxley Road Upgrades
The petition
Residents draw to the attention of Brisbane City Council the congestion and lack of infrastructure surrounding Oxley Road and Sherwood Road (between Sherwood and Rocklea). Our local councillor states that this has been brought to councils attention but as no progress has been made, the residents would like direct feedback as to future plans for our roads. A bus depot at Sherwood has seen no extra services for our area. There is more traffic in our area and no regular buses travelling between Oxley and Graceville, which would reduce the amount of parents on the roads at school collection/drop off times. The state of Sherwood Road between Sherwood and Rocklea is appalling and the impact of large vehicle traffic in this area should see double lanes as a top priority. Promoting traffic down Sherwood Road may also reduce the flow of traffic under the Corinda Rail line which has not been widened after repeated proposals.
Your petitioners therefore request that you speak directly to the local residents as to planning safer roads in our area. Development Applications in our area shall not be considered without an impact statement for traffic and local congestion. Developments attached to an Industrial Zone should also have a minimum area of road quality (eg double lanes) surrounding the development before any DA can be considered.
Council response
Thank you for your petition requesting Council speak directly with local residents about planning safer roads in Sherwood and Rocklea.
It is acknowledged that Sherwood Road’s east-west connection is a primary access route to the area for heavy vehicles accessing local destinations, as Oxley Road is constrained to the north and south by low clearance heights from the Ipswich rail line. High vehicle detours are in place in Honour Avenue and Lilly Street for vehicles travelling from the north or south respectively.
To plan for future road improvements to the Oxley Road and Sherwood Road corridors, the land required is being preserved through building setbacks from adjoining properties as development occurs. Current long-term planning for both Oxley Road (south of Sherwood Road) and Sherwood Road will provide four lane capacity, bike lanes and pedestrian pathways. By dedicating land for road purposes, Council’s long-term road planning allows for upgrade works to be progressed in a manageable way across the city.
Council has raised the Oxley Road rail bridge constraint on road traffic with the Queensland Government. Queensland Rail is in the early stages of investigating the merits of a replacement of the rail overbridge, which would include widening of the road.
Your feedback about bus services on Oxley and Sherwood Roads has been noted. While Council operates bus services, TransLink, a division of the Queensland Government’s Department of Transport and Main Roads, is responsible for funding and planning bus services.
Any consideration to enhance bus services requires an analysis of existing demand levels on bus services in the corridor, as well as taking into consideration other modes of public transport that are available. As rail services are the primary public transport mode within the Oxley and Graceville corridor it is considered that the service level for public transport is sufficiently met.
Bus services that operate out of Sherwood depot and service the Oxley and Graceville corridor include routes 104, 106, 598 and 599.
With regard to road maintenance, sections of Sherwood Road, outside the Rocklea Markets, have been listed for consideration to be resurfaced as part of Council’s future capital works program. Each June, all listed projects are prioritised and assessed against the overall needs of the city. The works that get approved have the highest priority in terms of public safety, convenience and the number of people directly benefitting in relation to the cost.
In the interim, road pavement, kerb and channel and drainage repairs on the west-bound lanes, outside the Rocklea Markets including the intersection at the western gate entrance have been scheduled to be completed by the end of June this year.
Your feedback about development applications has been noted. All development applications submitted to Council are carefully assessed by Council's Development Services, City Planning and Sustainability, against the requirements of Brisbane City Plan 2014 (City Plan) and in accordance with the Planning Act 2016 . City Plan ensures that development proposals adequately take account of impacts on local traffic networks, and require applicants to submit a Transport Impact Assessment (TIA) should a proposal trigger defined parameters.
The Transport, access, parking and servicing planning scheme policy within City Plan includes a guideline specifying the purpose, content and design standards required in the preparation of a TIA, and outlines the scale and type of development proposals that would typically trigger this requirement. It also specifies the requirement that TIAs should be prepared by a Registered Professional Engineer Queensland.
Further, Council is unable to impose development conditions or insist on the inclusion of development outcomes that are outside the scope of those defined in City Plan, and therefore cannot, for example, insist on a double-lane road if such an outcome is not outlined in the planning scheme.
Council cannot refuse to assess a development application prior to a full assessment against City Plan irrespective of a proposal’s suitability against these requirements.
Your request to consult with local residents on any future road changes has been noted. Community consultation is an important part of any Council project, and any project involving upgrades to roads such as Sherwood Road and Oxley Road would be a major infrastructure project. Accordingly, consultation would form part of these upgrades when they are being formally proposed.
Comments · 0
Please log in to post a comment.
Loading comments...