Skip to main content

Peak Downs Mine Continuation Project

View on the EPBC portal (opens in a new tab)
EPBC number: 2022/09350
Status: REFERRED, still live
Location: Queensland
Site: the Corner of Peak Downs Mine Road and Saraji Road, Moranbah
Proposer: BM Alliance Coal Operations Pty Limited
Industry: Mining
Referred: 5 Oct 2022
Project status: Assessment Approach Determined

Assessment stage

  • Done Lodgement
  • Done Validation
  • Done Referral Decision
  • Active Assessment
  • Upcoming Final Decision
  • Upcoming Post Approval
  • Upcoming Completed

Decisions and notices (4)

  • 18 Aug 2026 Decision on Assessment Approach: Public Environment Report
  • 27 Feb 2023 Decision on Assessment Approach: Not Applicable; Bilateral Agreement Applies - assessment pathway no longer applies
  • 9 Jan 2023 Decision whether action needs approval/Approval Required
  • 5 Oct 2022 Invitation for Public Comment on Referral

Project documents (27)

2022-09350-Assessment-Approach.pdf 272 KB
2022-09350-Referral-Decision.pdf 190 KB
00-2022-09350 Referral.pdf 1186 KB
Att A - EPBC Referral Figures.pdf 13477 KB
Att B - DAWE (2021) EPBC Act Protected Matters Report.pdf 87 KB
Att C - BMA (2020) REMP Annual Report.pdf 9679 KB
Att D ‘Approved Conservation Advice for the Brigalow (Acacia harpophylla dominant and co-dominant) ecological community’ .PDF 639 KB
Att E ‘Draft Referral guidelines for the nationally listed Brigalow Belt reptiles’.PDF 1169 KB
Att F ‘BMA Peak Downs Terrestrial Ecology Assessment – Interim Memo on Surveys Conducted in November and December 2021’.PDF 4088 KB
Att G - ERM (2022) March Fieldwork Technical Memo.pdf 7793 KB
Att H ‘BMA Peak Downs Mine Ecological Assessment of Dysart Road MC90 Realignment.PDF 7621 KB
Att I - Footprints (2009) Assessment of Koala and Koala Habitat Use on BMA Peak Downs Mine.PDF 1660 KB
Att J - AECOM (2020) PDM Terrestrial Ecology Baseline Report.pdf 8370 KB
Att K ‘Conservation Advice for Phascolarctos cinereus (Koala) combined populations of Queensland, New South Wales and the Australian Capital Territory’.PDF 1373 KB
Att L - SRK (2021) PDM OTD and ATD Hydrogeology Assessment_Part1.pdf 20155 KB
Att L - SRK (2021) PDM OTD and ATD Hydrogeology Assessment_Part2.pdf 19367 KB
Att L - SRK (2021) PDM OTD and ATD Hydrogeology Assessment_Part3.pdf 16168 KB
Att L - SRK (2021) PDM OTD and ATD Hydrogeology Assessment_Part4.pdf 19972 KB
Att L - SRK (2021) PDM OTD and ATD Hydrogeology Assessment_Part5.pdf 20255 KB
Att L - SRK (2021) PDM OTD and ATD Hydrogeology Assessment_Part6.pdf 20389 KB
Att L - SRK (2021) PDM OTD and ATD Hydrogeology Assessment_Part7.pdf 1871 KB
Att M - Jacobs (2017) Associated Water - Mine Site Inflow Estimates.pdf 1258 KB
Att N – SLR (2021) Caval Ridge Mine Horse Pit Extension Project Groundwater Assessment_P1.PDF 20221 KB
Att N – SLR (2021) Caval Ridge Mine Horse Pit Extension Project Groundwater Assessment_P2.PDF 20353 KB
Att N – SLR (2021) Caval Ridge Mine Horse Pit Extension Project Groundwater Assessment_P3.PDF 20419 KB
Att N – SLR (2021) Caval Ridge Mine Horse Pit Extension Project Groundwater Assessment_P4 .PDF 20162 KB
Att N – SLR (2021) Caval Ridge Mine Horse Pit Extension Project Groundwater Assessment_P5.PDF 2231 KB

Comments · 0

Loading...

Loading comments...