Skip to main content

ABF - Aerial Surveillance Contracts - Metrea

View on aph.gov.au (opens in a new tab)
Status: Open, still live
Asked by: Senator Leah Blyth
Portfolio: Home Affairs
Agency: Australian Border Force
Round: 2026-27 Supplementary budget estimates
Question No: SE26-1117
Asked: 26 Oct 2026
Answer due: 16 Dec 2026

Question

14. How many employees did Metrea Australia have when it submitted its tender, and how many does it have on the day this question is answered - including how many qualified pilots? And how many employees (including how many qualified pilots) should it have by this point under the transition plan? 15. The contract with Metrea provides for the existence of a fleet of 11 aircraft from January 2028. How many of the 11 aircraft now physically exist, and how many have been purchased? 16. How many have their mission systems fully installed and, alternatively, how many are currently undergoing modification? 17. How many have completed certification, and how many are presently in Australia? 18. In relation to the contractual deadlines for the full, final delivery and readiness for operation of each aircraft, has any milestone slipped and is the development of any of the aircraft currently behind schedule? 19. At Budget Estimates in May this year, the ABF said there were transition stages at which it would assess Metrea's readiness. Has Metrea failed to meet, and/or sought an extension for, any milestone in that context? 20. What happens in the event that any of the 11 Metrea aircraft are not operational on 1 January 2028? 21. Can the existing Leidos contract be extended; has the Department and/or the ABF priced such an extension option; and how much advance notice would Leidos require to extend? 22. What is the latest date on which the Department must decide whether Metrea will be ready for 1 January 2028 before it becomes impossible to extend or replace the incumbent capability without creating a surveillance gap? 23. (a). In relation to the tender with an ID of HOMEAFFAIRS/2216/RFI, who made the decision that additional market information was needed about persistent uncrewed maritime ISR capability - and was that decision made before or after the $4.32 billion contract with Metrea was signed on 1 May 2026? (b). If the decision was made after 1 May: what changed in the ten weeks after signing the Metrea contract that it was considered necessary to issue HOMEAFFAIRS/2216/RFI on 15 July? 24. What issues remained so unresolved after a multi-billion-dollar, multi-year aerial surveillance procurement that you perceived a need to return to industry only ten weeks later seeking information on alternative maritime surveillance technology? 25. Was any comparative cost analysis between crewed and uncrewed surveillance undertaken before the Metrea contract was finalised? 26. How many industry responses were received to HOMEAFFAIRS/2216/RFI, and have you completed your assessment of them? And, if you have completed your assessment of them, to what specific practical consequences and actions has the process led? 27. Across the base contract period of the $4.32 billion procurement with Metrea, how many surveillance flying hours is the Commonwealth contracted to receive? 28. How does that compare with the existing contract? And in each year from 2021-22 inclusive, for how many fixed-wing surveillance hours has the Commonwealth paid and how many were actually delivered? 29. Has the Department or the ABF established baseline values against which improvement will be measured in respect of the contract with Metrea? Or, if not, how will you establish whether the promised 'step-change in performance' has actually been delivered? 30. What specific measurable improvements does the Department expect from the Metrea contract in (a) range; (b) endurance; (c) response time; (d) vessel detection; (e) coverage; (f) data transmission; and (g) availability?

Comments · 0

Loading...

Loading comments...