Lake Colac School
Hydrotherapy Pool
Hydrotherapy Pools at Specialist Schools Fund
As part of the 2023–24 Victorian State Budget, this school shared in $25 million from the Hydrotherapy Pools at Specialist Schools Fund.
We’re building a new hydrotherapy pool at this school.
This project includes:
- a 15-metre hydrotherapy pool, with a depth to 1.5 metres and accessible ramp
- student and staff toilets, showers and changerooms
- a pool plant room
- external and landscaping works.
Hydrotherapy pools can have significant health benefits. Having one on site at their school can make accessing a pool easier for students.
Upgrade and Modernisation
From the 2020–21 Infrastructure Planning and Acceleration fund, the school was allocated $1.544 million in planning funding. In the 2020–21 State Budget, the school received $13.899 million. In 2021, an additional $3.767 million was allocated to the project.
We rebuilt the school on part of the former Colac High School site on Murray Street.
We modernised the existing heritage building on the site to house:
- staff areas and workspaces
- a library
- art room
- music room
- woodwork room
- food technology facility
- an Early Education Program (EEP) facility with its own dedicated playground.
We built new facilities, including:
- a classroom building with fit-for-purpose learning spaces, staff areas and art and food preparation spaces
- an administration building with a multi-purpose space, fitness room, reception, offices and a meeting room.
We also provided external works, including:
- a new visitor/staff car park
- a separate and secure bus and student entry area
- play areas
- a garden.
This school was previously known as Colac Specialist School. It changed names from the start of 2024.
Comments · 0
Please log in to post a comment.
Loading comments...