Skip to main content

Glen Eira College

School page (opens in a new tab)
Stage: Complete, finished
Address: 76 Booran Rd, Caulfield East 3145
Projects: 3

Every project at this school is complete.

Upgrade and Modernisation – Building Capacity

Upgrade and Modernisation

Complete
Start: Q2 2021
Finish: Q1 2026

In the 2021–22 State Budget, the school received at least $6.577 million, with a further $10 million in 2023.

We modernised and expanded this school. We built a new 3-storey building for Years 9 and 10 with a landscaped rooftop, located on the school’s netball courts on the corner of Miriam St and Booran Rd. We also upgraded the BER Language Centre.

These upgrades create modern learning environments and 250 extra places for local students.

Design elements

Each level of the new middle school has a central shared informal learning and circulation space connecting to classrooms and science labs. These central learning spaces can be used for flexible teaching, informal study and small group work. Each level is connected by internal and external staircases and has staff and student toilets.

We connected the ground floor classrooms to new landscaped gardens and seating areas. The upper levels have covered balconies. The landscaped rooftop breakout space has seating and gathering spaces for students.

We used colours and materials throughout the building that reflect Glen Eira College’s primary colours of grey, red, black and white, as well as the red bluff sandstone geology of the local area.

Inclusive Schools Fund

Complete
Start: Q4 2018
Finish: Q3 2019

In 2018, $134,000 was allocated to the school in Round 4 of the Inclusive Schools Fund.

We built a sensory garden, adjacent to the wellbeing centre, that incorporates a kitchen garden and outdoor dining area.

Upgrade and Modernisation

Complete
Finish: Q2 2018

In the 2015–16 State Budget, $950,000 was allocated to the school. The school also received $600,000 in School Pride and Sports Funding. In the 2016–17 State Budget, $8.55 million was allocated to the school.

We upgraded the school. This included refurbishing learning spaces in a flexible and connected way and grouping junior classes and senior classes together to give the students a sense of their own community.

We also extended the sports centre with a single-court competition-grade gymnasium.​

The canteen was also demolished and relocated.

Comments · 0

Loading...

Loading comments...