Emerald Secondary College
Upgrade and Modernisation – 2023–24 funding
Upgrade and Modernisation
In the 2023–24 State Budget the school received $8.77 million.
The project includes a new Block G featuring general-purpose classrooms, specialist art and media spaces, locker bays and associated landscaping works.
The project will also refurbish Blocks D and E, including the creation of a new STEM laboratory and roof repairs.
Upgrade and Modernisation – Blocks A, C and D
Upgrade and Modernisation
From the 2020–21 Infrastructure Planning and Acceleration fund, the school was allocated $558,000 in planning funding. In the 2020-21 State Budget, the school received $5.018 million.
We upgraded Block A, Block C (admin and library) and Block D. We undertook maintenance and roof works to Block E.
The upgrades help the school to:
- create a dynamic teaching environment with spaces that offer flexibility for team teaching
- remove congestion in corridors by providing designated locker spaces
- create welcoming and inviting staff hubs that foster creativity and community
- encourage staff and students’ wellbeing.
Upgrade and Modernisation
In the 2015–16 State Budget, $1.5 million was allocated to the school. A further $500,000 was allocated to the school from the 2017–18 Planned Maintenance Program.
We upgraded and modernised Emerald Secondary College.
These works developed an Inclusion and Learning Centre, modernised the library and redeveloped the technology and performing arts areas. We delivered an enlarged and re-equipped canteen and expanded the facilities within the performing arts building.
The project also included the repair and upgrade of storm water drains, pipes, roofs, windows and doors. The upgraded facilities ensures that all students' physical, intellectual, mental health, social and overall wellbeing needs are supported.
Comments · 0
Please log in to post a comment.
Loading comments...