Bacchus Marsh Eastern Link Road Planning Study Q and As
About the project
What factors were considered when choosing the preferred alignment? Community/stakeholder feedback was one of several factors considered in selecting a preferred alignment. Regional Roads Victoria (RRV) also considered findings from environmental surveys, cultural studies, traffic modelling and other technical assessments. All shortlisted options presented in 2020 had a number of advantages and disadvantages, and we assessed these factors to determine the preferred alignment. What are the key features of the preferred alignment? Option B Alternative route is approximately 11 kilometres in length. Key features of Option B Alternative include: - Two interchanges (one new and one upgraded) with entry and exit ramps to improve access to the Western Freeway - Bridge structure over three waterways and Irrigation District - A four-lane road, including access roads and roundabouts - Multi-modal corridor. including cycle paths. What are the next steps in the project? DTP is seeking direction on the required planning pathway. DTP will refer the project to the Minister for Planning to determine if an Environment Effects Statement (EES) is required as part of the planning process. An EES assesses the potential environmental impacts of a proposed development. Once a planning pathway is determined, we will provide further updates regarding: - Planning pathway for the Planning Scheme Amendment (PSA). The PSA includes a Public Acquisition Overlay to reserve land for road purposes and enable land to be acquired for the project. - Process for the public to provide a formal submission and make comments on the preferred alignment. Before an EES referral can be made, DTP will await outcomes of surveys to identify potential populations of the Victorian Grassland Earless Dragon. These studies are being undertaken separate to this project. For more information, visit the Department of Energy, Environment and Climate Action (DEECA) website Rediscovery of the Victorian grassland earless dragon after 50 years - DCCEEW . There are currently no plans for construction of a Bacchus Marsh Eastern Link Road. What is the ultimate road design for Option B Alternative? We've planned for a four-lane arterial road to cater for the future growth of Bacchus Marsh. The road corridor will include two lanes in each direction, a median strip, landscaping on both sides of the road, and a shared-use path on one side of the road. How wide will the alignment be? The width of the road corridor will vary and is generally expected to be between 60 and 100 metres, including the road, central median and embankments. The road corridor will be wider where it traverses the escarpment north and south of the freeway. Further work will be undertaken in the detailed design phase to refine the design of Option B Alternative and to minimise impacts on properties, environment, irrigation district and cultural heritage. The detailed design phase will take place when the project is funded for construction. Are properties impacted by Option B Alternative? The acquisition of private and public land will be required to create a new road reservation. A total of 55 landowners are expected to be directly impacted by the project. No landowners will lose their homes. Property impacts were a key factor in determining the preferred alignment option. We’ll consult with directly impacted landowners to provide information about the project and impacts to their properties. How does Option B Alternative impact the environment? All shortlisted routes impact on flora and fauna communities however Option B Alternative requires the least removal of native vegetation. This option does impact on the Golden Sun Moth (GSM) habitat north of the Western Freeway. Reduction to GSM impacts can be further investigated as part of detailed design. DTP will await outcomes of surveys to identify potential populations of the Victorian Grassland Earless Dragon. These studies are being undertaken separate to this project. Detailed investigations, including further technical reports to refine the design, will be undertaken during the planning approval phase of the project to further investigate impacts to the environment. How many river red gums near the eastern interchange and south of the eastern interchange will be removed as a result of Option B Alternative? Further investigations were undertaken to understand how the six shortlisted alignments interact with the river red gums, particularly in the vicinity of the confluence of Lerderderg River, Werribee River and Parwan Creek to better understand the impacts each alignment may have. All shortlisted alignments south of the Western Freeway impact the river red gums in this location. Option B Alternative currently impacts a lower number of river red gums than the routes at the bottom of the escarpment. During the planning approval phase of the project, further detailed investigations will be undertaken to refine Option B Alternative to further reduce this impact where possible. How are the indigenous scarred trees near the eastern interchange impacted? Consultation with Registered Aboriginal Parties has been extensive since 2019. Earlier in the planning process, two culturally significant scarred trees were identified within the study area. These scarred trees are not within Option B Alternative and therefore will not be impacted. RRV commissioned a Cultural Values Assessment and conducted further meetings with Registered Aboriginal Parties on site in 2021 and 2022 to discuss any cultural heritage impacts within the alignment options. A Cultural Heritage Management Plan will be prepared in the planning approval phase of the project. Will the preferred route impact access for the Our Lady Ta’ Pinu Shrine entrance at Flanagans Drive? There is no intention to move or relocate the existing driveway and access will be maintained. Option B Alternative does not impact access to the shrine.
Comments · 0
Please log in to post a comment.
Loading comments...