Alphington Link
Summary
We’re connecting bike riders and pedestrians in Alphington to the Darebin Creek Trail with a new off-road walking and bike riding path – the Alphington Link.
About the project
Update – September 2026 Works continue on the delivery of the new Alphington Link, a safe and direct walking and bike riding connection for the Alphington community. The new 120m shared use path, incorporating a new raised crossing on Farm Road, will enable bike riders and walker to safely connect to the Darebin Creek Trail from Farm Road. Since works began in April, we have: - undertaken earthworks to make way for the new shared use path - completed boring and piling and installed retaining wall posts and panels on the upper side of the shared use path - commenced drainage works. Over the coming month, our crews will: - complete drainage works - construct the retaining wall on lower side of the shared use path - lay a new pavement for the path - install protective fencing and rails for walkers and bike riders - apply linemarking and install signage - undertake landscaping works - install the new raised crossing and lighting on Farm Road. Image: Retaining wall piles and posts being installed Image: Construction continues on the upper retaining wall Image: Subsurface drainage pit being prepared for installation Image: Formwork for concrete drain on top of retaining wall What to expect during works - Works will continue on weekdays between 7am and 6pm. - NOTE: dates and times are subject to change due to weather conditions and the contractor’s program of works. - Most construction works are off-road, however there will be some traffic disruption on Farm Road when crews install the raised crossing. - There will be medium to high noise levels during retaining wall and asphalt works. Low to medium noise during all other works. For the safety of road users and workers, reversing beepers are required on all machinery. - Golfers wishing to use the practice fairway will continue to be temporarily detoured via the Darebin Creek Trail. - Up to four parking spaces on Farm Road will be permanently removed to make way for the new raised crossing. Background In 2018, we commenced community engagement on the project to inform the technical development of plans, designs and options. In 2021 we passed a necessary legislative amendment to enable compulsory acquisition of the land for the path. Wider community consultation took place on the proposed designs between 8 December 2021 and 31 January 2022. Feedback from this consultation helped us develop a design to ensure the Alphington Link reflects the community’s needs. Specifically, community feedback favoured a design that is sensitive to the environment, blends into the landscape and minimises construction impacts. As a result, the decision was made to build a walking and bike riding path at ground level instead of an elevated bridge, would save trees and have less impact on the landscape. The ground level path will blend better into the local environment, and the construction will be faster, reducing impact on residents and the golf club. The path design The new 3.0-metre-wide walking and bike riding path follows the same route as the earlier bridge design concept, from Farm Road to the Darebin Creek Trail through the Latrobe Golf Club. Bike riders and pedestrians will be protected by fencing, and golfers who want to use the practice greens/fairways will still have access.\ The design includes landscaping that is sensitive to the local area and blends with the surrounding environment. Alignment of the new path follows the same route as the previous design Click to enlarge Designs See below artist impressions of the Alphington Link. Please note, these designs are subject to change. Looking toward the new Alphington Link from the Darebin Creek Trail. Artist impression, subject to change. Looking toward the new Alphington Link entry from Farm Road. Artist impression, subject to change. Looking toward the new Alphington Link from the golf course practice fairway. Artist impression, subject to change. Aerial view of the new Alphington Link from above the golf course practice fairway. Artist impression, subject to change. Planning approvals The Minister for Planning approved Planning Scheme Amendment C329yara to the Yarra Planning Scheme on 22 December 2025, which enables the delivery of the Alphington Link project under the Alphington Link Incorporated Document (DTP, 2025) . A copy of the Amendment can be inspected, free of charge, at the Department of Transport and Planning website or by contacting 1800 789 386 to arrange a time to view the Amendment. The following documents have been approved under the Alphington Link Incorporated Document: - Environmental Management Framework (4.2.1) (PDF) - Landscape Plan (4.2.10 & 4.2.11) (PDF) - Urban Design Statement (4.2.12) (PDF) - Public Lighting Plan (4.2.13) (PDF) - Tree Management Plan (Clause 4.2.14) (PDF) Benefits of the Alphington Link The Alphington Link will provide the local community with a safer and more direct route to the Darebin Creek Trail and 600km of bike riding and walking routes. Walking and bike riding paths benefit a broad demographic, including families, schoolchildren, older people, and people with disabilities. Frequently asked questions Why did you change the Alphington Link design from a bridge to a path? When we took the proposed bridge to the community it was made clear that the community were keen to see a design that did not impact on the local environment more than necessary. Upon further investigation, we found that building a path rather than the proposed bridge would save trees and have less impact on the landscape. The new design will blend better into the local landscape, and construction will be faster and less impactful on residents and the golf club. Will trees be saved by building the path instead? The updated design reduces the impact on trees and on other vegetation in the area. Why did you select Farm Road as the preferred option?
Comments · 0
Please log in to post a comment.
Loading comments...