Gardiner tram substation
Summary
We’re upgrading Melbourne’s tram network to meet the city’s future needs and growing demand.
About the project
Upgrades to our network and tram fleet will make travel more reliable, efficient and convenient. To achieve this, we need to upgrade the tram power infrastructure in Glen Iris by building a new tram substation near the tram network. We’ve identified a suitable site within the rail reserve near the corner of Burke Road and King Street, Glen Iris. This location allows the tram substation to be connected to the tram network where our investigations show more power is needed. Project update From October to December 2023, we engaged with the community about the proposed Gardiner tram substation. During community consultation, we sought feedback on the overall project and what’s most important to the community as we design and deliver the Gardiner tram substation. Community feedback has been used to inform and develop the architectural concept designs for the new tram substation. Gardiner substation concept design Note: Artist's impressions only and subject to change. Images do not reflect other elements of the precinct or surrounding area. Construction is anticipated to begin in 2025 and be completed in 2026. We’ll update the community ahead of any works taking place. What did we hear from the community during consultation? From October to December 2023, we engaged with the community about the proposed Gardiner tram substation. The purpose was to raise awareness about the project and receive feedback on what is important as we design and deliver the new substation. Feedback from residents and business owners focussed on the following topics: - Visual impact and fit with the local character - Maintenance of landscaping around the substation - Management of any graffiti. - Environmental impacts: - Preserving parkland - Impacts on health and the environment due to EMF (electromagnetic fields) What is a tram substation? Tram substations are self-contained, unstaffed buildings that deliver power to the tram network. The substations contain electrical equipment that’s connected to nearby powerlines. Tram substations contain a transformer that converts high-voltage electricity from the local power network into the lower voltage needed to run trams. Without substations, the tram network can’t run. How will the tram substation be designed? ll tram substations are designed to ensure they meet all relevant operating safety standards and guidelines. Equipment for the tram substation will be housed inside the building. There won’t be any additional above-ground powerlines required to supply power to the substation. We will consult with the community and Council on the facility look and feel to align to the local urban character as far as is reasonably practical. The community can also provide feedback by emailing ptvprojects@transport.vic.gov.au . The new building will be architecturally designed with community feedback in mind. Will the tram substation produce harmful levels of EMF? Anywhere there is electricity, there are electromagnetic fields (EMFs), including in mobile phones, household appliances and the powerlines providing electricity to your home. Electromagnetic emissions from new tram substations are similar to the levels already produced by existing powerlines. EMF levels outside of tram substations will always be well below the international standards that have been adopted in Australia. Rigorous testing will be undertaken during the commissioning of the substation to ensure measured EMF levels are within the prescribed safe operating limits, and fully comply with the relevant National Health and Medical Research Council guidelines. EMF levels at 5-10m from the substation equipment are expected to be indistinguishable from normal background levels. Will any trees or vegetation be affected? We will work to minimise impacts to trees and vegetation as much as possible, however there are some trees at the site that may require relocation or replanting, depending on the final location of the tram substation. We will offset any tree removal by planting additional trees in accordance with Council’s tree management policies. Will parking be impacted? At this stage, we do not anticipate that parking will be impacted due to the proposed location within the rail reserve. Parking may be impacted during construction however we will ensure the community are made aware of any disruptions ahead of works taking place. Get in touch For more information or to share your feedback email us at ptvprojects@transport.vic.gov.au or call 1800 800 007.
Comments · 0
Please log in to post a comment.
Loading comments...