New signalised pedestrian crossing on Diamond Creek Road, Greensborough

Project page (opens in a new tab)
Status: Complete, finished
Mode: Walking
Region: Greater Melbourne
Department: Department of Transport and Planning
Updated: 19 Nov 2026

Summary

We’ve switched on the new pedestrian crossing lights on Diamond Creek Road in Greensborough.

About the project

Update - November 2026 The new pedestrian crossing lights on Diamond Creek Road in Greensborough have been switched on, with the new crossing now fully operational. Please be aware of changed conditions and prepare to stop when pedestrians are crossing Diamond Creek Road. What we’ve done We’ve built a new signalised pedestrian crossing on Diamond Creek Road, south of Greenhill Road in Greensborough to improve pedestrian safety and access to bus stops. As part of the improvements, we have also: - Built a ramp in the centre of the pedestrian crossing for accessibility and install pedestrian fencing. - Relocated the northbound bus stop at Greenhill Road/Diamond Creek Road approximately 100m south so it’s closer to the new signalised pedestrian crossing. - Removed the existing pedestrian refuge north of Greenhill Road. - Consolidated bus stops with low usage in the area by permanently closing the bus stops at Avandina Crescent/Diamond Creek Road and Spring Street/Diamond Creek Road. - Installed a ‘U-Turn Must Give Way’ sign at the Diamond Creek Road and Avandina Crescent intersection. - Refreshed and extend the existing cycle lane markings at the crossing in the northbound direction. - Constructed kerb outstands at the crossing. - Trimmed and removed two trees and some low-lying vegetation. Project map Click to enlarge Image description: Map showing the location of the new signalised pedestrian crossing and improvements. Bus stop closures The southbound bus stop at Spring Street/Diamond Creek Road is permanently closed. Please use the nearby bus stops at Greenhill Road/Diamond Creek Road (approx. 200m north) and Delfin Crescent/Diamond Creek Road (approx. 450m south). The northbound bus stop at Avandina Crescent/Diamond Creek Road has been permanently closed. Please use the nearby bus stops at Delfin Crescent/Diamond Creek Road (approx. 400m south) and Greenhill Road/Diamond Creek Road (approx. 300m north). Background The section of Diamond Creek Road between Civic Drive and St Helena Road is a key connection to local schools and amenities. Between May and July 2023, there were two crashes resulting in the serious injury of two students within this section of road. The new signalised pedestrian crossing will assist pedestrians to safely cross the road, including students and bus users accessing the bus stops. A safer speed limit of 60km/h was introduced in late 2024 on Diamond Creek Road between Civic Drive and Plenty River Drive. Get in touch To find out more about this project, please get in touch. Email: DOTroadprojects@transport.vic.gov.au

Comments · 0

Loading...

Loading comments...