Route 57
Summary
We are getting Route 57 in Melbourne’s north west ready for the next generation of trams, the G Class as part of the Next Generation Trams enabling infrastructure works.
About the project
G Class trams will deliver a more comfortable, accessible and energy efficient journey for passengers. The 25-metre-long G Class trams hold up to 150 passengers – almost twice as many as the oldest trams currently operating in Melbourne’s west. They feature a more accessible low-floor design, more doors, handrails and improvements to passenger information to make it easier for everyone to use public transport. About Route 57 Route 57 operates from West Maribyrnong to Flinders Street Station via Flemington, North Melbourne and the CBD. G Class trams operating on Route 57 will provide better connectivity to key destinations such as Highpoint Shopping Centre, Melbourne Central, Melbourne Showgrounds and Flemington Racecourse. Works are being undertaken in stages, with initial works starting in the second half of 2025. Key changes Queen Victoria Market on Elizabeth Street, Stop 7 What's happened - We improved accessibility at the Queen Victoria Market tram stop on Elizabeth Street. - We extended the tram stop to safely accommodate G Class trams. - We also widened the access ramps and pedestrian refuge to provide better accessibility and more space for waiting passengers. Queen Victoria Market on Victoria Street, Stop 8 What's happened - We built a new level-access tram stop on Victoria Street near the Queen Victoria Market. - We relocated and upgraded the tram stop to safely accommodate G Class trams. The new stop is between O’Connell and Cobden streets. - We made changes to parking on Victoria Street between Peel and Elizabeth Streets to allow for the level-access stop and allow for two lanes of traffic to ease road congestion. - We extended the Victoria Street tram tracks to connect across Elizabeth Street. This helps move trams between lines and depots to improve flexibility on the network by connecting the Swanston Street corridor to the north-west via Victoria Street. - Hook turns will be introduced in coming months on Victoria Street at Howard, Chetwynd and Leveson streets to facilitate the efficient and more reliable running of trams and the safe movement of vehicles and trams. Victoria Street and Peel Street - centre island tram stop Click to enlarge The North Melbourne Tram Corridor North Melbourne tram stop upgrades We’re upgrading tram stops along Route 57 in North Melbourne to prepare for larger G Class trams. These changes will make our street level stops safer and enable passengers to safely get on and off the new trams. Works will take place in stages along Errol, Queensberry and Victoria streets between 30 November and 15 December 2026. We will be completing further works to remove closed tram safety zones in early 2027. There will be temporary traffic changes at times, including lane closures, overnight road closures, parking changes and waste collection will be in place while works are underway. There will be some permanent parking changes on Errol Street, Queensberry Street and Victoria Street as a result of these works. For more detailed information on the consultation outcomes visit Engage Victoria . Errol Street We will be changing the existing two safety zone stop pairs at Errol and Victoria streets and Errol and Queensberry streets. These stops are only 200 metres apart and are not long or wide enough to safely accommodate the new G Class trams. The new tram stops will: - Be longer to better cater for passenger demand and the new longer trams. - Provide wider safety zones that offer more space for passengers to wait at the tram stop. - Have pedestrian crossings at both ends of the tram stop, including new zebra crossings to access the stops. - Include improved fencing and barriers, to better protect passengers from passing vehicles. - Remove six car parks on Errol Street, to enable the new tram stops and associated changes to traffic lanes to be introduced. - Modify bluestone at crossings to provide a safe, even surface for pedestrians. Click to enlarge Victoria Street For the Victoria Street corridor, the existing two tram stops at Howard Street and Chetwynd Street are only 130 metres apart. These stops are not long enough or wide enough to safely accommodate the new G Class trams. We will merge the tram stops at Howard and Chetwynd Streets into a new tram stop on Victoria Street between these two streets (see Map below). This new stop location balances the competing needs of road users while maintaining traffic flow on Victoria Street. The new tram stop will: - Be longer to better cater for passenger demand and the new longer trams. - Provide wider safety zones that offer more space for passengers to wait at the tram stop. - Have pedestrian crossings at both ends of the tram stop, including new zebra crossings. - Include improved fencing and barriers, to better protect passengers from passing vehicles. - Modify bluestone on the southern side of Victoria Street, between Howard and Chetwynd streets, to provide a safe, even surface for pedestrians and bike riders. - Remove up to 10 car parks along Victoria Street between Howard and Chetwynd streets to accommodate the larger stops and zebra crossings and enable associated changes to traffic and bike lanes to be introduced. - Introduce hook turns on Victoria Street at the intersections of William Street (west to south), Howard Street (east to north) and Chetwynd Street (east to north). - Introduce hook turns at Roden Street and Leveson Street to keep traffic and trams moving. - Introduce a right-turn ban from Victoria Street (west) into Chetwynd Street (south) - Introduce protected bike lanes on Victoria Street to separate bike riders from vehicles and improve safety. Click to enlarge Queensberry Street The two existing stop pairs on Queensberry Street, located at Curzon Street and Abbotsford Street, are only 200 metres apart. These stops are of insufficient length and width to safely cater for the new G Class trams.
Comments · 0
Please log in to post a comment.
Loading comments...