Skip to main content

Question on Notice 461/2026: Infrastructure renewal costs

View Answer (opens in a new tab)
Answered: Yes
Question Number: 461
Year: 2026
Asked By: Mr B Head
Minister Responsible: Minister for Education and the Arts (Hon J Langbroek)
Asked Date: 23 Apr 2026
Answer Due: 25 May 2026
Date Tabled: 25 May 2026

Topic

Infrastructure renewal costs

Question

With reference to the Minister’s media statement ‘Classrooms crumble under Labor’ and release of the Comprehensive Review of Infrastructure Renewal on 7 August 2025— Will the Minister provide (in table format) (a) what the total cost of renewal backlog was at the completion of the state-wide Asset Lifecycle Condition Assessments (as at 2023) for schools within the Callide electorate, (b) what this cost was for each school and (c) what the overall rating (i.e. fair, poor, very poor etc) was for each school?

Full text in the tabled PDF (opens in a new tab).

Comments · 0

Loading...

Loading comments...