Question on Notice 461/2026: Infrastructure renewal costs
Topic
Infrastructure renewal costs
Question
With reference to the Minister’s media statement ‘Classrooms crumble under Labor’ and release of the Comprehensive Review of Infrastructure Renewal on 7 August 2025— Will the Minister provide (in table format) (a) what the total cost of renewal backlog was at the completion of the state-wide Asset Lifecycle Condition Assessments (as at 2023) for schools within the Callide electorate, (b) what this cost was for each school and (c) what the overall rating (i.e. fair, poor, very poor etc) was for each school?
Full text in the tabled PDF (opens in a new tab).
Comments · 0
Please log in to post a comment.
Loading comments...