Question on Notice 974/2026: Transport Infrastructure Project Delivery System

View Answer (opens in a new tab)
Status: Open, still live
Question Number: 974
Year: 2026
Asked By: Mr S King
Minister Responsible: Minister for Transport and Main Roads (Hon B Mickelberg)
Asked Date: 15 Sept 2026
Answer Due: 15 Oct 2026

Topic

Transport Infrastructure Project Delivery System

Question

With reference to Appendix D of TMR's Transport Infrastructure Project Delivery System Volume 3M— Will the Minister advise, for each road and bridge construction contract with an original awarded value of $100m or more that was active during 2025–26 (a) whether the Prequalification and Contracts Unit directed additional contractor performance reporting during that period due to a continuing period of unsuitable performance and (b) if so, the number of such directions (reported separately by contract)?

Full text in the tabled PDF (opens in a new tab).